Tallaght & Connolly Satellite Hospitals

As part of the New Childrens Hospital project two new paediatric outpatients and urgent care centres are to be constructed:

  1. Connolly Hospital, Blanchardstown
  2. The Adelaide & Meath Hospital (Tallaght Hospital)

The paediatric outpatients & urgent care centres will provide urgent care paediatric services including short stay observation beds and outpatients clinics.

Typically the centres will care for children and young people who have a common minor illness or injury which cannot be managed by a GP.

The works comprise two new Children’s Satellite Hospitals at the existing Tallaght and Connolly Hospitals and a new modular Decant and crèche building at Tallaght Hospital. Works at Tallaght Hospital includes the refurbishment at ground floor of Tallaght Hospital (1,401M2) and associated demolitions.

What We Did at Tallaght & Connolly Satellite Hospitals

We carried out the electrical services installation on the below facilities.

Tallaght:
Construction of the satellite centre for the delivery of paediatric out-patient and urgent care services, at a 1.04 ha site to the southeast of Tallaght Hospital, comprising of a 3,333 sq.m. extension and 1,410 sq.m refurbishment works at ground floor level of the existing hospital building as part of the National Paediatric Hospital development. The works are located on an open area of grass west off the main hospital access road and south of the main adult hospital entrance, abutting the gable end of the existing ward and administration block and will connect back into the existing hospital through the existing refurbished ground floor of the existing administration department. The extension building is three storeys in height with roof top plant area

Connolly:
Construction of the satellite centre for the delivery of paediatric out-patient and urgent care services, at a 1.13 ha. site of Connolly Hospital, comprising of a 5,160 sq.m three storey extension and 100 sq.m internal reconfiguration works as part of the National Paediatric Hospital development. The works are located to the east of the existing main entrance on an area of open grass and will connect back into the existing hospital via a new link corridor.

Project snapshot

Project

Tallaght & Connolly Satellite Hospitals

Programme

22 Months