Grifols
The Grifols project comprises of a fully serviced international logistics centre with automated storage and retrieval systems. The project includes the construction of a new warehouse, distribution, packaging and logistics building along with a link annex and a 3 storey administration office block. We also carried out phase 2 of this project which included a 18,500sqm biopharmaceutical process facility extension to the existing logistics building which is connected by way of a feature link corridor.
![](https://joneseng.com/wp-content/uploads/2018/11/4.Grifols-Full.jpg)
What We Did at Grifols
- Fabrication and installation of Process and utility piping systems
- Installation of free issue plant and equipment
- Design, fabrication and installation of secondary support systems
- Fabrication and installation of full HVAC system
- Insulation of pipework & Ductwork
- BIM co-ordination and interface with other disciplines
- Automated production lines
- Fingerprint operated security
- BMS System
- Electric blinds
- High tech video conferencing equipment
- High spec lighting
![](https://joneseng.com/wp-content/uploads/2018/11/2.Grifols-600px.jpg)
![](https://joneseng.com/wp-content/uploads/2018/11/3.Grifols-600px.jpg)
Project snapshot
Project
Grifols
Programme
Phase 1 - 12 Months
Phase 2 - 12 Months
Project Team
![](https://joneseng.com/wp-content/uploads/2018/11/5.Grifols-Full.jpg)